Endeavour/Fusion Kernal resolved - 3/19/2003, 6.45PM

Engineers have resolved the situation. Both servers are now up with the latest stable kernal builds.
Endeavour/Fusion Kernal problem- 3/19/2003, 5.00PM

We are encountering problems with servers Fusion and Endeavour. Both servers are experiencing a KERNAL misconfiguration problem. We are working around the clock to get this situation solved.
Server FREEDOM Upgrade - 2/21/2003, 5.35AM

Due to constant high loads on the server Freedom, engineers had to take it down early this morning for an emergency hardware upgrade. The new system will feature Dual Intel P3 server class CPUs which will vastly reduce cpu loads.
Switch Upgrade and GigE line added - 2/01/2003, 11.24PM

The switch upgrade has completed and all affected servers are now operational. A new GigE (1000mbps) line has been added which will dramatically reduce latency and boost download speeds. You will notice a huge difference in speed and access times from now on.
Power Failure (FIXED) - 2/01/2003, 2.20PM

UPDATE: The power outage problem has been resolved. Affected servers are being restarted as of this moment.
Power Failure - 2/01/2003, 9AM

There are some major power outage problems at the NJ Data Center which is affecting servers "premiere, fusion and universal". The engineers are working around the clock to get this situation corrected.
Switch Upgrade - 1/31/2003, 10.30AM

The following servers listed below is scheduled for a new switch upgrade. Estimate downtime: 30 minutes.
Servers affected: Premiere, Fusion, Universal.
 

   